Pulsar Observatories Rigel Observatory Automation Handleiding
Pulsar Observatories
Niet gecategoriseerd
Rigel Observatory Automation
Bekijk gratis de handleiding van Pulsar Observatories Rigel Observatory Automation (29 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 8 mensen en kreeg gemiddeld 4.9 sterren uit 4.5 reviews. Heb je een vraag over Pulsar Observatories Rigel Observatory Automation of wil je andere gebruikers van dit product iets vragen? Stel een vraag
Pagina 1/29

[Type text] Page 1
OBSERVATORY INSTALLATION / USER GUIDES
Installation of a Pulsar Observatory takes approximately 3 hours for 2 persons. Extreme
care should be taken when aligning the dome panels, as once they have been joined with
silicone sealant; it is very difficult to separate them. The door, with lock, is pre-installed in
the wall panel.
CONTENTS:
Observatory base requirements
PAGE 2-4
Observatory installation guide
PAGE 5-10
Installing your protective rubber flooring
PAGE 12-13
Accessory bay installation guide
PAGE 14
Motor drive installation guide
PAGE 15-26
Additional notes
Parts List
PAGE 27
PAGE 28
FOR TECHNICAL SUPPORT CALL +44(0)1366 315006
Useful links:
https://www.pulsarastro.com/video-guides-27-w.asp
https://www.pulsarastro.com/

[Type text] Page 2
OBSERVATORY BASE REQUIREMENTS
For best results your observatory should be bolted to a concrete hard standing. This can be prepared by
yourself or you can employ a local builder / tradesman to do the work for you.
We always recommend using one of our Pulsar Astro steel piers for mounting
your telescope. This will not only give you a rock solid permanent alignment
for your telescope mount, but also will allow you to dispense with the tripod,
which takes up valuable floor space, and prevents you from accidentally
kicking one of the legs!
Your concrete base will need a substantial central block of concrete to take the
weight of your telescope setup, to provide a really solid footing.
This block needs to be 1000mm x 1000mm square, with a minimum depth of
600mm, positioned in the centre of your base. This will allow ample
movement for offsetting the pier if required. In an ideal situation it can be
isolated from the surrounding floor, although this not entirely necessary for a
solid foundation.
The dimensions and specifications for concrete hard standing base are as follows:
2.2M OBSERVATORY – 2400mm square or circular.
2.7M OBSERVATORY – 3000mm square or circular.
The base is best raised above ground level by at least 50mm to assist drainage, and needs to be as flat and
level as possible to ensure good dome performance. Also, as stated above, it can be square or circular in
shape.
Obviously, the square base is easier to produce, using straight lengths of timber shuttering.
The overall depth of the base should be a minimum depth of 150mm.
Product specificaties
Merk: | Pulsar Observatories |
Categorie: | Niet gecategoriseerd |
Model: | Rigel Observatory Automation |
Heb je hulp nodig?
Als je hulp nodig hebt met Pulsar Observatories Rigel Observatory Automation stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Niet gecategoriseerd Pulsar Observatories
Pulsar Observatories Rigel Observatory Automation Handleiding
30 Januari 2025Handleiding Niet gecategoriseerd
- Belanger
- Wurth
- Apelson
- LTC
- Enertex
- Termozeta
- Europa Leisure
- GP
- Level Mount
- Eltako
- Morningstar
- Dragonshock
- Icarus Blue
- Alto
- I-PRO
Nieuwste handleidingen voor Niet gecategoriseerd
23 Juli 2025
22 Juli 2025
22 Juli 2025
22 Juli 2025
22 Juli 2025
22 Juli 2025
22 Juli 2025
22 Juli 2025
22 Juli 2025
22 Juli 2025