Intermatic T105 Handleiding
Intermatic
Schakelaar
T105
Lees hieronder de đ handleiding in het Nederlandse voor Intermatic T105 (1 pagina's) in de categorie Schakelaar. Deze handleiding was nuttig voor 4 personen en werd door 2.5 gebruikers gemiddeld met 5.0 sterren beoordeeld
Pagina 1/1

LR3730
TIME
POINTER
TIME
DIAL
OFF
TRIPPER
MANUAL
LEVER
ON
TRIPPER
CLOCK MOTOR: 120 VAC, 60 HZ.
CLOCK MOTOR VOLTAGE AND CYCLE MUST BE AS SPECIFIED. TO
ORDER REPLACEMENT, INDICATE ART NO. (WG--) ON MOTOR COVER.
WIRING
DIAGRAM
TYPICAL WIRING: SINGLE POLE NORMALLY OPEN
SEE WIRING INSTRUCTIONS BELOW FOR OTHER TYPES
GROUND
120V
SUPPLY
CLOCK
MOTOR
GRD.
N
LINE
TO
LOAD
A
1
2 3
4
WARNING
Risk of Fire or Electric Shock
⢠Disconnect power at the circuit breaker(s) or disconnect switch(es) before installing or servicing.
⢠Installation and/or wiring must be in accordance with national and local electrical code requirements.
⢠Use wires rated at least 90°C - COPPER conductors ONLY.
⢠Replace plastic insulator covering terminals before powering ON.
⢠KEEP DOOR CLOSED AT ALL TIMES when not servicing.
NOTICE
⢠Rotate timer dial clockwise only.
⢠Do not move the clock hands on the timer. Moving the clock hands can damage the timer.
AVERTISSEMENT
Risque dâincendie ou de choc ĂŠlectrique
⢠Utiliser des ďŹls classĂŠs 90î°C minimum - Conducteurs en CUIVRE UNIQUEMENT.
PROGRAMMING INSTRUCTIONS
1. TO SET âONâ AND âOFFâ TIMES: Hold trippers against edge of CLOCK-DIAL, pointing
to time (AM or PM) when and operations are desired, tighten tripper screws ON OFF
firmly. For additional tripper pairs on order 156T1978A.CLOCK-DIAL
2. TO SET TIME-OF-DAY: Pull CLOCK-DIAL outward. Turn in either direction and align
the exact time-of-day on the (the time now, when switch is being put into CLOCK-DIAL
operation) to the pointer. DO NOT MOVE POINTER.
OPERATING INSTRUCTIONS
â˘
TO OPERATE SWITCH MANUALLY: MANUAL LEVERMove
CLOCK-DIAL below left or
right as indicated by arrows. This will not effect next operation.
⢠IN CASE OF POWER FAILURE, reset CLOCK-DIAL to proper time-of-day. See
programming instructions.
INTERMATIC INCORPORATED
SPRING GROVE, ILLINOIS 60081-9698
154--02050
PRESSURE PLATE
TERMINAL SCREW
MAKE SURE WIRE
INSULATION CLEARS
PRESSURE PLATE
MINIMUM
COPPER
WIRE SIZE
(AWG)
MAX.
LOAD
(AMP)
MIN.
INSUL-
ATION
TEMP(°C)
75°C INSULATION MAX. MOTOR
LOAD (HP)
SINGLE PHASE
3 PHASE
120 V. 240 V. 208 V.
240 V.
14
12
10
8
15
20
30
40
90
90
90
90
1/2
1
2
-
2
2 1/2
3
5
N/A
N/A
WIRING INSTRUCTIONS: Remove 1/2 inch of insulation from wire ends. Tighten terminal screws firmly
(2-18 in-lbs). Use solid or stranded COPPER only. May use two wires of the same size and type.conductors
To wire switch follow diagram above. To wire as SINGLE POLE NORMALLY CLOSED, move
clock motor lead from terminal , and connect to to To wire as 3 1to LINE 1, LOAD 2. SINGLE
POLE DOUBLE THROW, 2 install jumper (the same gauge as Line wire) between and 3 and
connect LINE to to 2, LOADS 1 and connection always as shown. 4. NEUTRAL
MODEL: T105
24 HOUR DIAL TIME SWITCH
TYPE 1 INDOOR USE ONLY
ONE NORMALLY OPEN - ONE NORMALLY CLOSED CONTACTS
MAY BE WIRED AS SINGLE POLE DOUBLE THROW (SPDT)
40 A RESISTIVE, INDUCTIVE, TUNGSTEN
OR 1000 VA PILOT DUTY PER POLE - 120/208/240 VAC;
2 HP (24 FLA) - 120 VAC; 5 HP (28 FLA) - 240 VAC
16 A ELECTRONIC BALLAST, 277 VAC
UL
HOLOGRAM
LABEL
Product specificaties
Merk: | Intermatic |
Categorie: | Schakelaar |
Model: | T105 |
Heb je hulp nodig?
Als je hulp nodig hebt met Intermatic T105 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Schakelaar Intermatic

24 Mei 2025

24 Mei 2025

24 Mei 2025

24 Mei 2025

24 Mei 2025

24 Mei 2025

24 Mei 2025

24 Mei 2025

24 Mei 2025

24 Mei 2025
Handleiding Schakelaar
- Schakelaar Matrox
- Schakelaar Vimar
- Schakelaar KanexPro
- Schakelaar LevelOne
- Schakelaar Smart-AVI
- Schakelaar Yamaha
- Schakelaar Blustream
- Schakelaar Mikrotik
- Schakelaar AMX
- Schakelaar SmartAVI
- Schakelaar EBERLE
- Schakelaar Powerfix
- Schakelaar Tork
- Schakelaar Sonance
- Schakelaar IOGEAR
Nieuwste handleidingen voor Schakelaar

6 Juni 2025

4 Juni 2025

4 Juni 2025

3 Juni 2025

3 Juni 2025

3 Juni 2025

2 Juni 2025

2 Juni 2025

2 Juni 2025

8 April 2025