Kelty Mach 6 Handleiding
Pagina's 1 Engels Tent
Bekijk de handleiding van Kelty Mach 6 gratis online of download de PDF. Deze handleiding is 21 keer bekeken. Vraag over dit model? Stel een vraag

Mach 4 & 6-Pitching Instructions
Package Includes: Fully assembled tent- AirPoles, Sleep room(s), Rain Fly-
AirPitch Pump, Tent Stakes.
In order to familiarize yourself with your new tent,
we recommend you “test pitch” before your rst
camping trip. For additional information please
visit http://www.kelty.com/c-tents-shelters.aspx.
Step 1: Find an even piece of ground; be sure area is clear of
debris. Lay out tent and stake all four corners. Be sure white
valve is rmly screwed into AirPole. Attach pump hose to
valve on AirPole and use included AirPitch pump to inate
until rm (no more than 6psi). (Mach 6 shown)
Step 2: If using double hose “T”, attach one hose to each AirPole
valve. If using single hose, inate AirPoles individually.
(Mach 6 shown)
Pump/hose attached to AirPole
(Mach 4 shown) AirPole valve and cap (closed)
Step 3: Pump until AirPoles inate. Standing tent up may require
a little lift on the AirPole.
(Mach 6 shown)
Step 4: Disconnect pump and screw valve cap in place. Fully stake
out tent and guy out points, including side vents.
(Mach 6 shown)
Mach 4 pictured
AirPole valve and cap open for ination
Product specificaties
| Merk: | Kelty |
| Categorie: | Tent |
| Model: | Mach 6 |
Heb je hulp nodig?
Als je hulp nodig hebt met Kelty Mach 6 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden