Festo VABM-B10-25S-G38-5 Handleiding
Bekijk gratis de handleiding van Festo VABM-B10-25S-G38-5 (1 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 10 mensen. Heb je een vraag over Festo VABM-B10-25S-G38-5 of wil je andere gebruikers van dit product iets vragen? Stel een vraag
Pagina 1/1

Assembly instructions (Original instructions)
8067317
1701b
[8067319]
†‡
Connection block
VABM-B10-25S
Festo SE & Co. KG
Ruiter Straße 82
73734 Esslingen
Germany
+49 711 347-0
www.festo.com
1.Applicable documents
All available documents for the product www.f
esto.com/pk
2.Safety
Switch off compressed air before mounting work.
Observe tigh
tening torques.
3.Intended use
Pneumatic linking of the valves.
4.Further info
rmation
Accessories for VABM www.fes
to.com/catalogue
5.Scope of delivery
20518d_3
VABM-B10-25S-...
1Connection block
2Screw M4x50
1)2)
3Screw M4x40
1)2)
4Seal
1)
5Blanking plug B-3/8
(1x)
(nx)
(nx)
(nx)
(3x)
20518d_4
VABM-B10-25S-...-P3
1Connection block
2Screw M4x50
1)2)
3Screw M4x40
1)2)
4Seal
1)
5Blanking plug B-3/8
(1x)
(nx)
(nx)
(nx)
(2x)
6.Not in scope of delivery
20520d_3
6Solenoid valve
VUVS-... or
pneumatic valve
VUWS-...
1)
(nx)
1)
The number of screws , seals 23/4 and valves 6 is dependent on the available valve
positions.
2)
Number = 2 x available valve positions
7.Mounting of blanking plugs 5
5
5
55
20518d_8
Screw in the blanking
plugs 5 at the desired
position, as required.
Blanking plug [Nm]
58.5 ± 15 %
8.Mounting of connection bl
ock 1
1
1
11
20518d_9
Place connection block 1
on mounting surface (A).
Tighten screws (B).
9.Alignment of seal 4
4
4
44
20518d_11
For valves VUVS-L/LT...:
Place the seal 4 in the
depression of the valve 6
so it is positive-locking.
Observe channel
designation 1/3/5 or 1/3.
20518d_12
For valves VUVS-LK...-S:
Place seal 4 on the
valve 6. Observe channel
designation 1/3/5 or 1/3.
Indexing hole (X) on the
valve 6 is:
–only relevant for the
connection block
VABM-B10-25S-...
–hidden according to the
alignment of the seal 4.
10.Mounting of valve 6
6
6
66
Information
Screws 3 can only be mounted with solenoid valves 6 VUVS-LK…-S.
20518d_10
/Push screws 23 into the
drill holes of the valve 6.
Only screws 2 are
loss-protected.
Position valve 6 on the
connection block 1.
Check:
–Projection (C) is in the
slot (D)
–Valve 6 is aligned parallel
to the surface (E)
–Channel designations 1/3/5
or 1/3 agree with each
other.
Tighten screws 23/.
6
3 Nm _ 20 %
2
/
3
1
1
5
2
4
5
A
B
6
4
D
1
E
5
6
4
C
315
6
4
C
315
X
3
1
2
3
4
X
X
Product specificaties
| Merk: | Festo |
| Categorie: | Niet gecategoriseerd |
| Model: | VABM-B10-25S-G38-5 |
Heb je hulp nodig?
Als je hulp nodig hebt met Festo VABM-B10-25S-G38-5 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Niet gecategoriseerd Festo
Festo DFM-40-80-B-PPV-A-KF Handleiding Festo VABM-B10-25E-G12-7-P3 Handleiding Festo VAEM-L1-S-24-AP Handleiding Festo VMPA2-B8-R6C2-C-06 Handleiding Festo VABM-B10-25-G12-10-P53 Handleiding Festo VMPA14-B8-R3C2-C-06 Handleiding Festo VABM-B10-30E-G34-3 Handleiding Festo VABM-B10-20S-G14-5-P3 Handleiding Festo DGST-25-80-E1A Handleiding Festo EFSD-100-PV-M12 Handleiding
Populair in Niet gecategoriseerd
Festo VZQA-C-M22C-15-S5S5-ALV4E-6-E Handleiding Festo SFAB-200U-HQ10-2SV-M12 Handleiding Festo DPDM-Q-6-15-P-PA Handleiding