Jindara Kimberley Mk2 Handleiding

Jindara Heater Kimberley Mk2

Lees hieronder de 📖 handleiding in het Nederlandse voor Jindara Kimberley Mk2 (2 pagina's) in de categorie Heater. Deze handleiding was nuttig voor 24 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/2
Compact Zero Clearance
Cabinet Installation
ZCC Part No. 225333
Installation notes:
The Gason Zero Clearance Cabinet is an approved cabinet that allows for Eureka/Jindara Insert woodheaters as stated above to be installed within
replace in accordance with AS :2001.2918
This can be achieved by following the installation guidelines listed below.
Select the po n that you wish to to install your ZCC , carsitio roof cavity (The outer
being 255mm requires a 25mm clear ce on either side to combustibles, making overall clearance 305mm).an
. Note: Line up centre holes with corresponding holes depending on model. Refer to diagram on sheet 2.
Fit the to the upstands and terminate at the required height above the roof line.
Fit 300mm x 100mm vermin proof vent directly behind where the will be located, as near as practicable to the r. This vent will
allow air access to the zero box either from another room or external air. Note, if installed on r, an additional two vents are
required. i.e. Either thr r, one each side of the zero box, or alternatively, through the side wall(s), if applicable.
Build your frame around the
m aining the clearances listed above.ant
Cover the rest of the frame to suit your requirments with plaster, timber, MDF etc.
Install the mantel if required. Note if mantle is made out of a combustible material the following dimensions must be adhered to.
All dimensions are minimum and must under no circumstances be reduced. Gason Pty Ltd accepts no liability whatsoever for their
interpretation of AS :2001.2918
Sheet 1 NEXT 2 GPN 231080 Rev.A
Sheet 1 NEXT 2 GPN 231080 Rev.A
545
763 Zero
Clearance
Box
To suit Insert models: Opal SRS4, Riverina SRS3,
D
A min. gap for60mm
Opal SRS4/Riverina SRS3
and gap for 120mm
Stockade SRS5/Barossa SRS3
timber stud.
The timber stud may need
to be notched out to allow
for the minimum required
Stockade SRS5, Barossa SRS3, Kimberley Mk2, Hamersley Mk2
Federation Mk2 & Victorian Insert
NOTE:
F
Tripleskin
Flue
690
660
836
30
E
MODEL A B C D E F G H I J
Opal
Riverina
Stockade
Barossa
Kimberley
Hamersley
Federation
Victorian
A
C
Hearth Width
12 570 890 810 40 20 1040 1100 50 250 530
12 550 950 810 40 20 1340 1390 50 250 510
18 615
18 705 1000
All dimensions in millimetres, images not to scale
Clearance to combustibles
Insert your chosen appliance into the zero cabinet. Note: p1-x2 galvanized c-section brackets supplied are required to centralise
Opal/Riverina, Stockade/Barossa. For installation of Kimberley, Hamersley, Federation and Victorian, appliances must sit on c-section
to ensure correct installation height is achieved. Fit active ue and cowl once appliance is in position.
See oversheet for dimensions.
(non-combustible cement sheet, villaboard or similar) in the position desired for the ZCC, ensuring hearth will
1140 25 250 550 940 1063 100 50 1050
B
12 570 890 810 40 20 1040 1100 50 250 530
12 550 950 810 40 20 1340 1390 50 250 510
18 705 1000
18 705 1000
1063 100 50 975 1225 150 250 600
1063 100 50 975 1225 150 250 600
1063 100 50 975 1225 150 250 600
Cover the front face of framing with a minimum 4mm cement sheet or non-combustible material.
A. F.
mm in front
of unit
Hearth depth
the ZCC
ZCC
ZCC
extend fully underneath ZCC as shown above for relevent model. Place the ZCC into position.
Sheet 2 NEXT - GPN 231080 Rev.A
Sheet 2 NEXT - GPN 231080 Rev.A
6 inch Flue Kit (Eureka & Jindara)
Spigot
3rd Skin
2nd Skin
1st Skin
Heater
10” Upstand
• 10” Upstands
55mm
97mm
• 8” Upstand
10” Gal Flue
8” Gal Flue
S/S Flue
8” Upstand
425mm
370mm
10”
8”
450mm
370mm
4th Skin
Non-combustible
hearth
Breast plate no
thicker than 30mm
(appliance to
mantle upright)
(max)
2 petS1 petS
Plaster, timber, MDF etc.
Minimum 4mm thick
cement sheet, villaboard
or non-combustible
material on front face
of framing
Minimum Requirements:
5 x 6” S/S Flue
4 x 8” Gal Flue
4 x 10” Gal Flue
Note: Some states will use dierent size ue kits
which will require the appropriate upstand.
Non-combustible material can
overlap clearance gap between
ZCB and frameing, and run over
the front of the ZCB. DO NOT
silicon or adhear material to ZCB
as heat expansion of ZCB will
cause cracking.
H
G
J
I
E
Vent - Position vent
such that access is
available to fan power
supply when vent is
removed.
NOTE: Position of upstands on Zero Box di ers depending
on model type. Line up centre screw hole on Zero Box with
corresponding notch on upstands.
Barossa, Stockade
& Kimberley Models
Opal & Riverina
Models
Hamersley Models
Victorian Insert
& Federation Models
Hearth depth
mm in front
of unit
Vent may be
located in the
wall of on the oor.
Compact Zero Clearance
Cabinet Installation


Product specificaties

Merk: Jindara
Categorie: Heater
Model: Kimberley Mk2

Heb je hulp nodig?

Als je hulp nodig hebt met Jindara Kimberley Mk2 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Heater Jindara

Handleiding Heater

Nieuwste handleidingen voor Heater