CyberPower RB1260X8B Handleiding
CyberPower Accu RB1260X8B
Bekijk gratis de handleiding van CyberPower RB1260X8B (2 pagina’s), behorend tot de categorie Accu. Deze gids werd als nuttig beoordeeld door 2 mensen en kreeg gemiddeld 4.0 sterren uit 5 reviews. Heb je een vraag over CyberPower RB1260X8B of wil je andere gebruikers van dit product iets vragen? Stel een vraag
Pagina 1/2

Smart App Online RT 1-3KVA S
Smart App Online RT 1-3KVA S
Smart App Online RT 1-3KVA S
Smart App Online RT 1-3KVA SSmart App Online RT 1-3KVA Ser
er
er
ereries
ies
ies
ies ies
MODEL: OL1000RTXL2U, OL1500RTXL2U, OL2200RTXL2U,
OL3000RTXL2U, OL3000RTXL2UHV, OL1000ERTXL2U,
OL1500ERTXL2U, OL2000ERTXL2U, OL3000ERTXL2U,
OL1000RT JP, OL1500RT JP, OL2200RT JP,
OL3000RT JP
Smart App Online EBM for RT 1-1.5KVA Se
Smart App Online EBM for RT 1-1.5KVA Se
Smart App Online EBM for RT 1-1.5KVA Se
Smart App Online EBM for RT 1-1.5KVA SeSmart App Online EBM for RT 1-1.5KVA Serie
rie
rie
rieries
s
s
s s
MODEL: BP36V60ART2U, BPE36V60ART2U, BPE36V60ART2US
Battery
Battery
Battery
Battery Battery Replacement
Replacement
Replacement
Replacement Replacement
Ins
Ins
Ins
InsInstru
tru
tru
trutructio
ctio
ctio
ctioctions
ns
ns
ns ns
1. Remove the front panel.
2. Remove the screws securing the battery retention panel.
3. Pull the battery pack out together with the retention panel slowly and then
put the new battery pack back into the UPS.
4. Reconnect the battery pack connectors the UPS. Then tighten the screto ws
of the battery retention panel.
5. Reinstall the front panel.
6. Execute a battery test via the LCD control panel, go to the Configuration
Menu, then scroll to the UPS Diagnostic then select battery test and Activate,
then scroll to Reset ReplaceBAT to reset the battery replacement date.
This operation can also be done via PowerPanel® Business Agent or RMCARD
web interface. Please see their respective User Manuals for detailed
instructions.
1. Remove the front panel.
2. Remove the screws securing the battery retention panels.
3. Pull the battery packs out together with the retention panels slowly and
then put the new battery packs back into the EBM.
4. Reconnect the battery pack connectors the to EBM enclosure. Then tighten
the screws of the battery retention panel.
5. Reinstall the front panel.
6. Execute a battery test via the LCD control panel, go to the Configuration
Menu, then scroll to the UPS Diagnostic then select battery test and Activate,
then scroll to Reset ReplaceBAT to reset the battery replacement date.
This operation can also be done via PowerPanel® Business Agent or RMCARD
web interface. Please see their respective User Manuals for detailed
instructions.
For USA and Canada
For USA and Canada
For USA and Canada
For USA and CanadaFor USA and Canada:
:
:
: :
4241 12th Ave East, Suite 400
Shakopee, MN 55379
Toll-free: (877) 297-6937
For all other regions
For all other regions
For all other regions
For all other regionsFor all other regions:
:
:
: :
Please visit our website for
local contact information.
CyberPower Systems,
CyberPower Systems,
CyberPower Systems,
CyberPower Systems, CyberPower Systems, In
In
In
InInc
c
c
cc.
.
.
. .
www.cyberpower.com
K01-0000459-05
Smart App Online EBM for RT 2-3KVA Se
Smart App Online EBM for RT 2-3KVA Se
Smart App Online EBM for RT 2-3KVA Se
Smart App Online EBM for RT 2-3KVA SeSmart App Online EBM for RT 2-3KVA Seri
ri
ri
riries
es
es
es es
MODEL: BP72V60ART2U, BPE72V60ART2U, BPE72V60ART2US
Smart App Online RT 6-10KVA Se
Smart App Online RT 6-10KVA Se
Smart App Online RT 6-10KVA Se
Smart App Online RT 6-10KVA SeSmart App Online RT 6-10KVA Seri
ri
ri
riries
es
es
es es
MODEL: BP240VL3U01, BP240VL3U02, BP240V30ART3U,
BP240V50ART3U, BPE240V30ART3U, BPE240V50ART3U,
BPE240V30ART3US, BPE240V50ART3US
MODEL: OL5KRTHDL, OL6KRTHDL, OL5KERTHDL, OL6KERTHDL
1
3
7
8
6
4
5
1. Remove the front panel.
2. Remove the screws securing the battery retention panels.
Unscrew the battery connector retention hardware. Disconnect the battery
power cables and then remove the panel itself.
3. Pull the battery packs out slowly and then put the new battery packs
back into the compartment.
4. Reconnect the battery pack to the EBM enclosure and screw on the
battery connector retention hardware. Tighten the screws of the battery
retaining cover.
WARNING - It is very important reconnect battery connections with the to
correct polarity. Connectors are color coded red and black for positive and
negative polarity respectively. Permanent damage may be caused to the
equipment if polarity is reversed.
5. Reinstall the front panel.
6. Execute a battery test via the LCD control panel, go to the Configuration
Menu, then scroll to the UPS Diagnostic then select battery test and Activate,
then scroll to Reset ReplaceBAT to reset the battery replacement date.
This operation can also be done via PowerPanel® Business Agent or RMCARD
web interface. Please see their respective User Manuals for detailed
instructions.
5. Pull the battery trays out slowly and then put the new battery trays into
the compartment.
6. Assemble the battery retention bracket and tighten the thumbscrew.
7. Connect the internal battery connector and battery management module
connector. Ensure that they are seated properly
(connector will click into place).
8. Tighten the screw on the battery access door and install the front
panel back. Push the front panel to left side. Tighten the screws on the
front panel.
9. Execute a battery test via the LCD control panel. To do this go to the Main
Menu and select the Diagnostics Icon, then select Battery Test and
Activate. After Battery test, go back to the Main Menu then select the Set
UP icon, then select Batt Install Date to set the battery installation date.
This operation can also be done via PowerPanel® Business or the
RMCARD web interface. Please see their respective User Manuals for
detailed instructions.
1. Remove the front panel.
2. Remove the screws securing the battery retention panel.
3. Raise the battery retention panel above the battery compartment opening to
allow the battery trays to be pulled out. Then put the new battery trays into
the compartment.
4. Align and reconnect the battery connectors and tighten the screws of
the battery retention panel.
5. Reinstall the front panel.
6. Execute a battery test via the LCD control panel, go to the Configuration
Menu, then scroll to the UPS Diagnostic then select battery test and Activate,
then scroll to Reset ReplaceBAT to reset the battery replacement date.
This operation can also be done via PowerPanel® Business Agent or RMCARD
web interface. Please see their respective User Manuals for detailed
instructions.
1. Unscrew and push the front panel to right side to remove it.
2. Unscrew and open the battery access door. This screw is designed to be
fixed on the door, do not remove it from the metal cover.
3. Disconnect the internal battery connector and battery management
module connector.
4. Unscrew the thumbscrew on the battery retention bracket and then
remove it.
Replacement Bat
Replacement Bat
Replacement Bat
Replacement BatReplacement Battery Pack Table
tery Pack Table
tery Pack Table
tery Pack Table tery Pack Table
Model Name
Battery QTY
UPS or EBM Model
RB1290X3L,
RBP0074
3
OL1000RTXL2U, OL1500RTXL2U, BP36V60ART2U (LEFT),
OL1000ERTXL2U, OL1500ERTXL2U, BPE36V60ART2US (LEFT)
RB1290X3R,
RBP0079
3
BP36V60ART2U (RIGHT), BPE36V60ART2US (RIGHT)
RB1290X6A,
RBP0076
6
OL2200RTXL2U, OL3000RTXL2U, OL3000RTXL2UHV,
OL2200ERTXL2U, OL3000ERTXL2U
RB1290X6B,
RBP0077
6
BP72V60ART2U, BPE72V60ART2US
RB1290X10,
RBP0072
10
BP240VL3U02, BP240V50ART3U, BPE240V50ART3U,
BPE240V50ART3US
RB1270X10,
RBP0073
10
BP240VL3U01, BP240V30ART3U, BPE240V30ART3U,
BPE240V30ART3US
RBP0131
12
BP72V60ART2U, BPE72V60ART2US
RBP0132
6
BP36V60ART2U, BPE36V60ART2US
RBP0133
20
BP240V50ART3U, BPE240V50ART3U, BPE240V50ART3US
RBP0134
20
BP240V30ART3U, BPE240V30ART3U, BPE240V30ART3US
RB1290X12,
RBP0174
12
OL5KRTHDL, OL6KRTHDL, OL5KERTHDL, OL6KERTHDL
RBP0144,
RB1260X12
12
OL5KRTHD, OL6KRTHD, OL5KERTHD, OL6KERTHD
RBP0145,
RB1290X6D
6
BP144VL2U01, BPE144VL2U01
RB1290X8,
RBP0159
8
OL8KRTHD, OL10KRTHD, OL12KRTHD, OL8KERTHD, OL10KERTHD,
OL12KERTHD
RB1260X8B,
RBP0164
8
BP192VL2U01 (LEFT), BPE192VL2U01 (LEFT)
RB1260X8A,
RBP0163
8
BP192VL2U01 (RIGHT), BPE192VL2U01 (RIGHT)
All CyberPower Systems replacement battery cartridges listed
in this manual use Non-Spillable Sealed Lead Acid Batteries.
CyberPower Systems encourages environmentally sound
methods for disposal and recycling of its battery cartridges.
Please dispose of and/or recycle your batteries in accordance
to the local regulations of your state.
2
Smart App Online RT OL6KRTHDL for Series
Smart App Online RT OL6KRTHDL for Series
Smart App Online RT OL6KRTHDL for Series
Smart App Online RT OL6KRTHDL for Series Smart App Online RT OL6KRTHDL for Series
Product specificaties
| Merk: | CyberPower |
| Categorie: | Accu |
| Model: | RB1260X8B |
Heb je hulp nodig?
Als je hulp nodig hebt met CyberPower RB1260X8B stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Accu CyberPower
27 Mei 2026
28 November 2025
28 Juli 2025
24 December 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
Handleiding Accu
Nieuwste handleidingen voor Accu
12 Mei 2026
5 Mei 2026
4 Mei 2026
4 Mei 2026
1 Mei 2026
31 Maart 2026
30 Maart 2026
26 Maart 2026
26 Maart 2026
25 Maart 2026