Zoeller 10-4011 Handleiding
Bekijk gratis de handleiding van Zoeller 10-4011 (12 pagina’s), behorend tot de categorie Pomp. Deze gids werd als nuttig beoordeeld door 2 mensen. Heb je een vraag over Zoeller 10-4011 of wil je andere gebruikers van dit product iets vragen? Stel een vraag
Pagina 1/12

© Copyright 2016 Zoeller
®
Co. All rights reserved.
For indoor use only.
All electrical and safety codes must be followed in addition to the National Electrical Code and all applicable local codes.
SPECIFICATIONS
This alarm unit monitors liquid levels in lift pump chambers, sump pumps basins, holding tanks, and other non-potable water applications. It features a green
“power on” light, a red input light, an audible buzzer, and a silence/test button. The APak
®
plugs into a 120 V, 60 Hz receptacle. Battery backup power is applied by
two standard alkaline AA batteries, which are not included and must be purchased separately (see Figure A).
ALARM UNIT INSTALLATION
1) Before installing alarm, remove the 4 cover screws to access battery compartment (see Figure B) and install two standard alkaline AA batteries, not included.
2) Mount the alarm unit securely.
3) Plug transformer’s barrel connector into the APak
®
. Secure power cord so it does not interfere with or obstruct any other devices.
4) Plug transformer into standard, 120 V AC, 60 Hz receptacle.
NOTE:The APak
®
Alarm should be connected to a circuit separate from the pump circuit.
Installations using AC power and batteries can skip the following explanation and chart. Some installations may require the APak
®
alarm to be powered by
batteries only or by AC power only. To receive appropriate alarm behavior in such installations, see the following chart.
FM2931
1016
Supersedes
0816
NOTICE TO INSTALLER: Instructions must remain with installation.
Figure A
SK3103
SILENCE
INPUT 1
POWER
ZOELLER
ALARM
PUMP "ON"
PUMP "OFF"
FIBERGLASS
OR POLYETHYLENE
BASIN
"ON" LEVEL
LEVEL
LEVEL
4" [102 mm] OF GRAVEL
ALARM
ZOELLER
TRANSFORMER TO POWER SUPPLY
TO POWER SUPPLY
UNICHECK
"DO NOT" PLUG A-PAK ALARM SYSTEM
INTO THE SAME CIRCUIT AS THE PUMP
NOTE:
ZOELLER
VERTICAL
REED SENSOR
Product information presented
here reects conditions at time
of publication. Consult factory
regarding discrepancies or
inconsistencies.
MAIL TO: P.O. BOX 16347 • Louisville, KY 40256-0347
SHIP TO: 3649 Cane Run Road • Louisville, KY 40211-1961
(502) 778-2731 • 1 (800) 928-PUMP • FAX (502) 774-3624
visit our web site:
www.zoeller.com
®
Your Peace of Mind is Our Top Priority
®
SILENCE
INPUT 1
POWER
REMOVE (4) COVER SCREWS
TO INSTALL/REPLACE BATTERIES.
TO POWER SUPPLY.
TO CONTROL SWITCH.
Figure B
SK3102
ALARM INSTALLATION INSTRUCTIONS
Power choiceResulting alarm behaviorDo this
AC & batteriesAlarms for power outage and low battery.Insert batteries and connect to power.
AC onlyLow battery alarm disabled.
Hold button while powering up the alarm for about 5 seconds until green power LED turns
on. This setting will be remembered by the alarm even after a power outage. If this setting is
no longer desired, simply adding batteries will remove this setting.
Batteries onlyPower outage alarm disabled.Insert batteries. The alarm will not detect AC power if it is never applied.
10-4011 pictured
Product specificaties
| Merk: | Zoeller |
| Categorie: | Pomp |
| Model: | 10-4011 |
Heb je hulp nodig?
Als je hulp nodig hebt met Zoeller 10-4011 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Pomp Zoeller
8 September 2026
7 September 2026
31 Maart 2025
31 Maart 2025
31 Maart 2025
27 Maart 2025
27 Maart 2025
12 Augustus 2023
12 Augustus 2023
12 Augustus 2023
Handleiding Pomp
Nieuwste handleidingen voor Pomp
8 September 2026
4 Augustus 2026
3 Augustus 2026
3 Augustus 2026
9 Juli 2026
8 Juli 2026
7 Juli 2026
23 Juni 2026
22 Juni 2026
5 Juni 2026