MODEL #
PIT FLOOR WIDTH &
OPENING WIDTH
PIT FLOOR
LENGTH
RR-65/EH-6580"53"
RR-66/EH-6680"65"
RR-68/EH-6880"89"
RR-610/EH-61080"113"
RR-75/EH-7592"53"
RR-76/EH-7692"65"
RR-78/EH-7892"89"
RR-710/EH-71092"113"
INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)
Part A: Prepare the Site & Make the Floor
1.) Prepare (concrete) dock wall and pit floor as
shown in the diagrams. Pit floorshould taperfrom
back to front. The front of the pit should be1/2"
lower than theback. Tapering the floorfacilitatespit
cleaning and allows to pit to drain tothe outside of
the building.
2.) The installation site should be excavated such
that the rough grade of the area surrounding the pit
slopes gently from the rough grade of the
surrounding floor to the bottom ofthe pit floor.
DOCK
WALL
FRONT CURB (RECOMMENDED)
(3" x 3" x 1/4" ANGLE WITH "J" ANCHORS)
PIT FLOOR
LENGTH
PIT FLOOR
WIDTH
24"PIT
HEIGHT
OPENING
WIDTH
FRONT
CURB
AREA
SURROUNDING
PIT SHOULD
SLOPE FROM
ROUGH
GRADE OF
FLOOR TO
BOTTOM OF PIT
BACK
FRONT
Vestil Manufacturing Corp.
2999 North Wayne Street, P.O. Box 507, Angola, IN 46703
Telephone: (260) 665-7586 Toll Free (800) 348-0868 Fax: (260) 665-1339
Web: www.vestilmfg.com E-mail: [email protected]
Page 1 of 5
Product specificaties
| Merk: | Vestil |
| Categorie: | Niet gecategoriseerd |
| Model: | RR-76-20 |
Heb je hulp nodig?
Als je hulp nodig hebt met Vestil RR-76-20 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Niet gecategoriseerd Vestil
Vestil WL-100-6-810 Handleiding Vestil CYL-D-1 Handleiding Vestil LM-OBT-6-36 Handleiding Vestil CYL-LT-1-PN Handleiding Vestil PEL-400S-57-D3 Handleiding Vestil SNM-62-FF-21 Handleiding Vestil DDL-55-AL Handleiding Vestil E-TUG-30 Handleiding