Speco Technologies CVCJBBW Handleiding


Pagina's 2 Engels Niet gecategoriseerd

Bekijk de handleiding van Speco Technologies CVCJBBW gratis online of download de PDF. Deze handleiding is 23 keer bekeken. Vraag over dit model? Stel een vraag

Compatible Model
Optional Accessories
Installation Instruction Diagram
s
Dimensions
• CVC5100BPVF, CVC5200BPVF
• CVC5815DNV, CVC5915DNV
• HTINTB8, HTINTB9, HTINTB10
• HTINTB8G, HTINTB10G
• HTB11FFi
• HT5100BPVFG, HT5200BPVFG
• OB1, OINT56B1G
Bullet J Bunction ox
The following items are included in this package.
• CVCJBB / CVCJBBW
• 1 Base Sponge Gasket
• 4 Tapping Screws #8 x 25
• 4 Hexagon Socket Screws M5 x 10
Side ViewFront View
CVCJBB / CVCJBBW
Package Contents
200 New Highway, Amityville N 11701Y
800.645.5516 / www.specotech.com
Installation Guide
1-1. Install junction box onto the wall by using the screws provided.
INTCM
Pole/Corner Mount

Beoordeel deze handleiding


Product specificaties

Merk: Speco Technologies
Categorie: Niet gecategoriseerd
Model: CVCJBBW

Heb je hulp nodig?

Als je hulp nodig hebt met Speco Technologies CVCJBBW stel dan hieronder een vraag en andere gebruikers zullen je antwoorden