Sime Murelle 70 Box ErP Handleiding
Sime
Niet gecategoriseerd
Murelle 70 Box ErP
Bekijk gratis de handleiding van Sime Murelle 70 Box ErP (56 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 7 mensen en kreeg gemiddeld 4.7 sterren uit 4 reviews. Heb je een vraag over Sime Murelle 70 Box ErP of wil je andere gebruikers van dit product iets vragen? Stel een vraag
Pagina 1/56

199839
ENSURE THAT THESE
INSTRUCTIONS ARE LEFT
FOR THE USER AFTER
COMPLETION OF THE
BENCHMARK SECTION
PLEASE READ THE
IMPORTANT NOTICE
WITHIN THIS GUIDE
REGARDING YOUR BOILER
WARRANTY
USER, INSTALLATION AND SERVICING INSTRUCTIONSUSER, INSTALLATION AND SERVICING INSTRUCTIONS
MURELLE
70 BOX ErP
Cod. 6328224 - 02/2024 - R1
ORIGINAL INSTRUCTIONS

This boiler may require 2 or more operatives to move it into its installation site, remove it from its packaging and
during movement into its installation location. Manoeuvring the boiler may include the use of a sack truck and
involve lifting pushing and pulling.
Caution should be exercised during these operations.
Operatives should be knowledgeable in handling techniques when performing these tasks and the following
precautions should be considered:
– Grip the boiler at the base
– Be physically capable
– Use personal protective equipment as appropriate e.g. gloves, safety footwear.
During all manoeuvres and handling actions, every attempt should be made to ensure the following unless
unavoidable and/or the weight is light.
– Keep back straight
– Avoid twisting at the waist
– Always grip with the palm of the hand
– Keep load as close to the body as possible
– Always use assistance
WARNING
Caution should be exercised when performing any work on this appliance.
Protective gloves and safety glasses are recommended.
– Avoid direct contact with sharp edges.
– Avoid contact with any hot surfaces.
NOTICE
Please be aware that due to the wet testing of the appliance, there may some residual water in the hydraulic circuit.
– Protect any surfaces, carpets or floorings.
– Use a suitable container to catch any water that escape when removing the protective caps from the connections.
SAFE HANDLING
CONFORMITY
Our Company declares that MURELLE 70 BOX ErP boilers comply with the essential requirements of the following
directives:
- Boiler Efficiency Directive 92/42/EEC
- Gas Regulation 2016/426/EC
- Electromagnetic Compatibility Directive 2014/30/UE
- Low Voltage Directive 2014/35/UE
- Ecodesign Directive 2009/125/EC
- Regulation (EU) N. 813/2013 - 811/2013
- Regulation (EU) 2017/1369
MURELLE 70 BOX ErP: Gas Council number 47-283-88
Product specificaties
Merk: | Sime |
Categorie: | Niet gecategoriseerd |
Model: | Murelle 70 Box ErP |
Heb je hulp nodig?
Als je hulp nodig hebt met Sime Murelle 70 Box ErP stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Niet gecategoriseerd Sime
11 Juni 2025
10 Juni 2025
10 Juni 2025
27 Maart 2025
27 Maart 2025
27 Maart 2025
27 Maart 2025
27 Maart 2025
27 Maart 2025
26 Maart 2025
Handleiding Niet gecategoriseerd
- Etna
- ClimeMET
- Trigano
- Schwaiger
- Redrock Micro
- iAXBi
- Woox
- Teltonika
- Baby Brezza
- SSV Works
- Sjöbergs
- JWIN
- Aguilar
- Tube-Tech
- AS - Schwabe
Nieuwste handleidingen voor Niet gecategoriseerd
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025
1 Augustus 2025