Nelson R75 Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Nelson R75 (2 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 26 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/2
R75 End of Pivot Sprinkler
Performance & Installation Details
R75ASSY - 5/19
Squeeze tabs on
the side of the plate
assembly and pull.
Thread-in the 7TN
nozzle.
Replace plate
assembly. Guide shift
lever between stops
as shown in Fig. 4.
Drain Required
6” Minimum
1 2 3 4
IMPORTANT: NOZZLE NEEDS TO BE INSTALLED BEFORE OPERATION!
[CLICK!]
SHIFT LEVER
Make sure shift lever
is between stops as
shown. ADJUST
STOPS TO GIVE
DESIRED ARC OF
COVERAGE (PAGE 2).
STOPS
REQUIRED PLUMBING. Poor
entrance conditions diminish
performance.
WARRANTY AND DISCLAIMER: Nelson Irrigation’s End of Pivot Sprinklers are warranted for one year from date of original sale to be free of defective materials and workmanship when used within
the working specications for which the products were designed and under normal use and service. The manufacturer assumes no responsibility for installation, removal or unauthorized repair of
defective parts. The manufacturer’s liability under this warranty is limited solely to replacement or repair of defective parts and the manufacturer will not be liable for any crop or other consequential
damages resulting from defects or breach of warranty. THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR PARTICULAR PURPOSES AND OF ALL OTHER OBLIGATIONS OR LIABILITIES OF MANUFACTURER. No agent, employee or representative of the
manufacturer has authority to waive, alter or add to the provisions of this warranty, nor to make any representations or warranty not contained herein. This sprinkler may be covered by one or more
of the following U.S. Patent Numbers and other U.S. Patents pending or corresponding issued or pending foreign patents.6,814,305 and 6,827,291
Pressure
(psi)
#52 (13/32") #60 (15/32") #72 (9/16")#56 (7/16") #64 (1/2") #68 (17/32")
Flow (gpm) Radius (ft) Flow (gpm) Radius (ft) Flow (gpm) Radius (ft) Flow (gpm) Radius (ft) Flow (gpm) Radius (ft) Flow (gpm) Radius (ft)
R75
LP
25 23.6 49.0 27.3 51.0 31.2 53.0 35.4 55.0 39.8 55.0 44.4 56.0
30 26.0 52.0 29.8 53.0 34.1 54.0 38.8 57.0 43.7 57.0 48.8 58.0
35 28.0 53.0 32.4 55.0 36.9 55.0 42.0 59.0 47.2 59.0 52.6 60.0
40 30.0 54.0 34.6 56.0 39.7 56.0 44.9 59.0 50.6 60.0 56.4 61.0
R75
40 30.0 57.0 34.6 59.0 39.7 61.0 44.9 65.0 50.6 65.0 56.4 64.0
45 31.7 58.0 36.8 60.0 42.0 62.0 47.6 66.0 53.7 66.0 59.7 65.0
50 33.6 59.0 38.8 61.0 44.4 63.0 50.2 67.0 56.5 67.0 63.1 65.0
55 35.3 59.0 40.7 62.0 46.6 64.0 52.7 68.0 59.2 68.0 66.1 66.0
60 36.8 59.0 42.7 62.0 48.8 65.0 55.0 69.0 61.9 68.0 69.2 67.0
PERFORMANCE (U.S. UNITS)
Pressure
(bar)
#52 (13/32") #60 (15/32") #72 (9/16")#56 (7/16") #64 (1/2") #68 (17/32")
Flow (m3/h) Radius (m) Flow (m3/h) Radius (m) Flow (m3/h) Radius (m) Flow (m3/h) Radius (m) Flow (m3/h) Radius (m) Flow (m3/h) Radius (m)
R75
LP
1.75 5.4 14.9 6.3 15.5 7.1 16.2 8.1 16.8 9.2 16.8 10.2 17.1
2.00 5.8 15.5 6.7 16.2 7.6 16.5 8.7 17.4 9.8 17.4 10.9 17.7
2.50 6.4 16.5 7.5 16.8 8.5 16.8 9.7 18.0 10.9 18.0 12.1 18.3
2.75 6.8 16.5 7.8 17.1 9.0 17.1 10.2 18.0 11.5 18.3 12.7 18.6
R75
2.75 6.8 17.4 7.8 18.0 9.0 18.6 10.2 19.8 11.5 19.8 12.7 19.5
3.00 7.1 17.7 8.2 18.3 9.4 18.9 10.6 20.1 12.0 20.1 13.3 19.8
3.50 7.7 18.0 8.9 18.6 10.2 19.2 11.5 20.4 13.0 20.4 14.4 19.8
4.00 8.2 18.0 9.5 18.9 10.9 19.8 12.3 21.0 13.9 20.7 15.4 20.4
PERFORMANCE (METRIC UNITS)
R75/R75LP performance data has been obtained under ideal test conditions and may be adversely affected by wind, poor hydraulic entrance conditions or other factors. Test riser height of 9 feet (2.7 meters) above mea-
surement surface. No representation regarding droplet condition, uniformity, application rate, or suitability for a particular application is made herein.
Order
Nozzles
Separately
7TN Nozzles
#12178-xxx
-052, #52 (13/32”) Beige
-056, #56 (7/16”) Red
-060, #60 (15/32”) Yellow
-064, #64 (1/2”) Green
-068, #68 (17/32”) Blue
-072, #72 (9/16”) White
R75
40-60 psi
(2.75-4.00 bar)
1 Œ” Thread
NPT #11936-001
BSP #11936-101
R75LP
25-40 psi
(1.75-2.75 bar)
1 Œ” Thread
NPT #11936-002
BSP #11936-102
R75 Arc Settings for Pivot Applications
Single R75, Dual R75, and R75 + SR100 applications require different arc settings. Start with
a 180 degree arc setting straight out and adjust offset based on the recommendations below.
Each groove represents ~5 degrees, so 3 clicks forward or backward equals 15 degrees.
12
39
REFERENCE IMAGE
This is a 180 degree arc setting without any offset
built in yet. The left stop is at 9 o’clock and the
right stop is at 3 o’clock.
DIRECTION OF PIVOT (CLOCKWISE)
R75 + SR100
5°
210° ARC
2P
4Q
SINGLE R75
180° ARC
15°
3Q
1. Left stop 3 clicks Q
2. Right stop 3 clicks Q
1. Right stop 4 clicks Q
2. Left stop 2 clicks P
DUAL TRAILING R75
20°
180° ARC
4Q
4Q
DUAL LEADING R75
180° ARC
10° 2P
2P
1. Left stop 2 clicks P
2. Right stop 2 clicks P
1. Left stop 4 clicks Q
2. Right stop 4 clicks Q
848 Airport Road, Walla Walla, Washington 99362 U.S.A. / Tel: +1 509.525.7660 / info@nelsonirrigation.com / www.nelsonirrigation.com
Set SR100
at 90
degrees,
straight out


Product specificaties

Merk: Nelson
Categorie: Niet gecategoriseerd
Model: R75

Heb je hulp nodig?

Als je hulp nodig hebt met Nelson R75 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Nelson

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd