LUCIDA FabCore FC-3307 Handleiding

LUCIDA Niet gecategoriseerd FabCore FC-3307

Bekijk gratis de handleiding van LUCIDA FabCore FC-3307 (14 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 4 mensen en kreeg gemiddeld 3.8 sterren uit 2.5 reviews. Heb je een vraag over LUCIDA FabCore FC-3307 of wil je andere gebruikers van dit product iets vragen? Stel een vraag

Pagina 1/14
Product Information
L V T F L O O R I N G
Installation Guide
Care & Maintenance
Warranty Information
2 | Product Information
Part 1. Installation Guide
Thank you for choosing a Lucida product. When properly installed and cared for, your new ooring
will be easy to maintain and keep its great look for years.
warranty.
WARNING!
Your old Floors may contain Asbestos!
DO NOT SAND, DRY SWEEP, DRY SCRAPE, DRILL,
SAW, BEAD-BLAST OR MECHANICALLY CHIP OR
PULVERIZE PREVIOUSLY INSTALLED EXISTING
RESILIENT FLOORING, BACKING, LINING FELT,
ASPHALTIC “CUTBACK” ADHESIVES OR OTHER
ADHESIVES, AS THESE PRODUCTS MAY CONTAIN
ASBESTOS FIBERS AND/OR CRYSTALLINE
SILICA.
Avoid creating dust when removing
existing ooring and adhesive.
Inhalation of such dust is a cancer
and respiratory tract hazard.
Smoking by individuals exposed to
asbestos bers greatly increases
the risk of serious bodily harm.
Unless positively certain that the
product is a non-asbestos-containing
material, you must presume it
contains asbestos. Regulations may
require that the material be tested
to determine asbestos content and
may govern the removal and disposal
of material. See current edition of
the Resilient Floor Covering Institute
(RFCI) publication Recommended Work
Practices for Removal of Resilient Floor
Coverings for detailed information
and instructions on removing all
resilient covering structures.
TOOLS REQUIRED:
Tape Measure, 100 lb. Roller, Square Ruler,
Chalk Line, Utility Knife
I. GENERAL PREPARATIONS
Commercial glue down LVT should be
stored, installed, and maintained in a
climate-controlled indoor location between
65° - 85°F.
Always check the cartons to assure the
pattern number is correct. Work from 2 to 3
cartons at a time, mixing the planks during
the installation.
Inspection of ooring material prior to
installation is required. Any defects should
be immediately reported to the supplier
from which the ooring was purchased
before installation. Lucida Surfaces will not
be responsible for labor costs to repair or
replace material with defects that were
apparent before or noticed at the end of an
installation.
Check if suboor/site conditions comply with
the specications described below. If you are
not satised, do not install, and contact your
supplier.
Flooring products can be damaged by
rough handling before installation. Exercise
care when handling and transporting these
products. Store, transport and handle the
ooring planks in a manner to prevent any
damage. Store cartons at, never on edge.
Flooring products can be heavy and bulky.
Always use proper lifting techniques when
handling these products. Whenever possible,
make use of material-handling equipment
such as dollies or material carts. Never lift
more than you can safely handle.
Ensure that moisture tests have been
conducted and that the results do not exceed
the acceptable moisture limit for the adhesive
used.
LVT ooring MUST be allowed to acclimate
Product Information | 3
to the temperature and humidity of the
room. Leave the closed package in a
horizontal position for at least 48 hours
prior to installation. Preferred temperature
should be 65° - 85°F. If ooring is exposed
to temperatures less than 40°F for more than
one hour, an additional 4 hours of acclimation
is required at the preferred temperature.
Install the product only after the jobsite has
been cleaned and cleared of other trade
apparatus that may damage a nished tile
installation.
NOTICE
Commercial glue down LVT is not
recommended for: outdoor installations,
showers, counter tops.
II. SUBFLOOR INFORMATION
Careful and correct preparation of the
suboor is a major part of a satisfactory
installation. Roughness or unevenness of the
suboor will telegraph through the new oor
covering, resulting in an unsightly surface and
excessive wear on high spots. The atness of
wood suboors or underlayments must not
exceed on variation of 1/4in 10 feet (1/2cm
in 3 meters).
All suboor/underlayment patching must be
done with a non-shrinking, water-resistant
Portland cement patching compound.
Never install commercial glue down LVT over
residual asphalt-type (cut back) adhesive. It
can bleed through the new oor covering.
Residual asphalt type adhesive must be
completely removed and covered with
underlayment.
Floor must be clean, smooth, at and
dry. Remove all foreign substances such
as wax, grease, dirt, construction marks
and contaminants, and any substance or
chemical that would interfere with a good
bond. Avoid using sweeping compounds.
Do not install over substrates that have been
chemically cleaned.
UNDERFLOOR HEATING NOTICE
Underoor heating is possible with
warm water heating systems.
For other underoor heating
systems/mats, check with the
underoor heating manufacturer.
Before tting, please conrm suitability
and their guarantee. The temperature
of the oor surface must not exceed
85°F (29.44°C) at any point.
Before installing over newly constructed
radiant heat systems, operate the system
at maximum capacity to force any residual
moisture from the cementitious topping of
the radiant heat system. Moisture emission
from suboor cannot exceed 3 lbs. per 1,000
sq. ft. per 24 hours as measured with the
calcium chloride test in accordance with
ASTM F1869-04 or ASTM F2170 In-Situ
Relative Humidity not to exceed 75%.
Turn the heat off for 24 hours before, during
and 24 hours after installation when installing
over radiant heated suboors. Failure to
turn the heat off may result in signicantly
shortened working time of the adhesive.
Make sure that the temperature in the room is
at least 65°F (18°C) during installation.
Floor temperature must not exceed 85°F
(30°C).
Once the installation has been completed,
the heating system should be turned on and
increased gradually (5 degree increments)
until returning to normal operating conditions.
Refer to the radiant heat system’s
manufacturer recommendations for
additional guidance.
Failure to strictly follow adhesive
manufacturer’s guidelines may result in
failure and void the warranty.
ELECTRIC HEATING MATS NOTICE
Electric heating mats that are not embedded


Product specificaties

Merk: LUCIDA
Categorie: Niet gecategoriseerd
Model: FabCore FC-3307

Heb je hulp nodig?

Als je hulp nodig hebt met LUCIDA FabCore FC-3307 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden