LUCIDA BaseCore BC-911 Handleiding
LUCIDA
Niet gecategoriseerd
BaseCore BC-911
Bekijk gratis de handleiding van LUCIDA BaseCore BC-911 (14 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 2 mensen en kreeg gemiddeld 4.7 sterren uit 1.5 reviews. Heb je een vraag over LUCIDA BaseCore BC-911 of wil je andere gebruikers van dit product iets vragen? Stel een vraag
Pagina 1/14

Product Information
P E E L & S T I C K L V T / L V P F L O O R I N G
Installation Guide
Care & Maintenance
Warranty Information

Part 1. Installation Guide
Thank you for choosing a Lucida product. When properly installed and cared for, your new ooring
will be easy to maintain and keep its great look for years.
Please read all the instructions before you begin the installation. Improper installation will void
warranty.
WARNING!
Your old Floors may contain Asbestos!
DO NOT SAND, DRY SWEEP, DRY SCRAPE, DRILL,
SAW, BEAD-BLAST OR MECHANICALLY CHIP OR
PULVERIZE PREVIOUSLY INSTALLED EXISTING
RESILIENT FLOORING, BACKING, LINING FELT,
ASPHALTIC “CUTBACK” ADHESIVES OR OTHER
ADHESIVES, AS THESE PRODUCTS MAY CONTAIN
ASBESTOS FIBERS AND/OR CRYSTALLINE
SILICA.
• Avoid creating dust when removing
existing ooring and adhesive.
Inhalation of such dust is a cancer
and respiratory tract hazard.
Smoking by individuals exposed to
asbestos bers greatly increases
the risk of serious bodily harm.
• Unless positively certain that the
product is a non-asbestos-containing
material, you must presume it
contains asbestos. Regulations may
require that the material be tested
to determine asbestos content and
may govern the removal and disposal
of material. See current edition of
the Resilient Floor Covering Institute
(RFCI) publication Recommended Work
Practices for Removal of Resilient Floor
Coverings for detailed information
and instructions on removing all
resilient covering structures.
TOOLS REQUIRED:
Tape Measure, 100 lb. Roller, Square Ruler,
Chalk Line, Utility Knife
I. GENERAL PREPARATIONS
•
Peel and Stick LVT/LVP should be stored,
installed, and maintained in a climate-
controlled indoor location between 65° -
85°F.
•
Always check the cartons to assure the
pattern number is correct. Work from at least
3 or 4 cartons at a time, mixing the Planks/
Tiles during the installation.
•
Inspection of ooring material prior to
installation is required. Any defects should
be immediately reported to the supplier
from which the ooring was purchased
before installation. Lucida Surfaces will not
be responsible for labor costs to repair or
replace material with defects that were
apparent before or noticed at the end of an
installation.
•
Check if suboor/site conditions comply with
the specications described below. If you are
not satised, do not install, and contact your
supplier.
•
Flooring products can be damaged by
rough handling before installation. Exercise
care when handling and transporting these
products. Store, transport and handle the
ooring planks in a manner to prevent any
damage. Store cartons at, never on edge.
• Flooring products can be heavy and bulky.
Always use proper lifting techniques when
handling these products. Whenever possible,
make use of material-handling equipment
such as dollies or material carts. Never lift
more than you can safely handle.
•
Ensure that moisture tests have been
conducted and that the results do not exceed
the acceptable moisture limit for the adhesive
used.
•
Peel and Stick LVT/LVP ooring MUST be

Product Information | 3
allowed to acclimate to the temperature
and humidity of the room. Leave the closed
package in a horizontal position for at least
48 hours prior to installation. Preferred
temperature should be 65° - 85°F. If ooring
is exposed to temperatures less than 40°F
for more than one hour, an additional 4 hours
of acclimation is required at the preferred
temperature.
• Install the product only after the jobsite has
been cleaned and cleared of other trade
apparatus that may damage a nished tile
installation.
NOTICE
This product is not recommended or
warrantied for: outdoor installations, showers,
counter tops, walls and ceilings etc.
II. SUBFLOOR INFORMATION
•
Careful and correct preparation of the
suboor is a major part of a satisfactory
installation. Roughness or unevenness of the
suboor will telegraph through the new oor
covering, resulting in an unsightly surface and
excessive wear on high spots. The atness of
wood suboors or underlayment’s must not
exceed on variation of 1/4” in 10 feet (1/2cm
in 3 meters).
• All suboor/underlayment patching must be
done with a non-shrinking, water-resistant
Portland cement patching compound.
•
Never install BaseCORE over residual
asphalt-type (cut back) adhesive. It can bleed
through the new oor covering. Residual
asphalt type adhesive must be completely
removed and covered with underlayment.
•
Floor must be clean, smooth, at, and
dry. Remove all foreign substances such
as wax, grease, dirt, construction marks
and contaminants, and any substance or
chemical that would interfere with a good
bond. Avoid using sweeping compounds.
Do not install over substrates that have been
chemically cleaned.
UNDERFLOOR HEATING NOTICE
Underoor heating is possible with
warm water heating systems.
For other underoor heating
systems/mats, check with the
underoor heating manufacturer.
Before tting, please conrm suitability
and their guarantee. The temperature
of the oor surface must not exceed
85°F (29.44°C) at any point.
•
Before installing over newly constructed
radiant heat systems, operate the system
at maximum capacity to force any residual
moisture from the cementitious topping of
the radiant heat system. Moisture emission
from suboor cannot exceed 3 lbs. per 1,000
sq. ft. per 24 hours as measured with the
calcium chloride test in accordance with
ASTM F1869-04 or ASTM F2170 In-Situ
Relative Humidity not to exceed 75%.
• Turn the heat off for 24 hours before, during
and 24 hours after installation when installing
over radiant heated suboors. Failure to
turn the heat off may result in signicantly
shortened working time of the adhesive.
•
Make sure that the temperature in the room is
at least 65°F (18°C) during installation.
•
Floor temperature must not exceed 85°F
(30°C).
•
Once the installation has been completed,
the heating system should be turned on and
increased gradually (5 degrees increments)
until returning to normal operating conditions.
•
Refer to the radiant heat system’s
manufacturer recommendations for
additional guidance.
•
Failure to strictly follow adhesive
manufacturer’s guidelines may result in
failure and void the warranty.
ELECTRIC HEATING MATS NOTICE
Electric heating mats that are not embedded
into the suboor are not recommended for use
Product specificaties
Merk: | LUCIDA |
Categorie: | Niet gecategoriseerd |
Model: | BaseCore BC-911 |
Heb je hulp nodig?
Als je hulp nodig hebt met LUCIDA BaseCore BC-911 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Niet gecategoriseerd LUCIDA
30 Juni 2025
30 Juni 2025
30 Juni 2025
30 Juni 2025
30 Juni 2025
30 Juni 2025
30 Juni 2025
30 Juni 2025
Handleiding Niet gecategoriseerd
- GMB Gaming
- BLUEPALM
- XPG
- RDL
- Autel
- Rockustics
- Chef's Choice
- Martin Audio
- Iseki
- Babylonia
- PETECHTOOL
- G3 Ferrari
- Ciclo
- Incubato
- Game Factor
Nieuwste handleidingen voor Niet gecategoriseerd
1 Juli 2025
1 Juli 2025
1 Juli 2025
1 Juli 2025
1 Juli 2025
1 Juli 2025
1 Juli 2025
1 Juli 2025
1 Juli 2025
1 Juli 2025