Bekijk gratis de handleiding van Full Boar DPC-AU02 (1 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 3 mensen en kreeg gemiddeld 5.0 sterren uit 2 reviews. Heb je een vraag over Full Boar DPC-AU02 of wil je andere gebruikers van dit product iets vragen? Stel een vraag

Pagina 1/1
Inverter parallel operation instructions.
It is possible to connect two Full Boar SD2200i generators to each other, using a
parallel cable kit DPC-AU02, to increase available power output.
DANGER! Never connect the paralleling cord to the inverters with
the inverters running. The inverters must not be running and both the
paralleling cord switches must be off when connecting the cords.
WARNING! Do not attempt to parallel the inverter with any other
manufacturers’ inverters. Do not use the paralleling cord for any application
inverters.
WARNING! Always ensure that both ends of the paralleling cord are
switched off before connecting the inverters.
OFF
ON
AC SW.
OPERATION
OUTLETS
1. Connect Ground Wire (GREEN) to the Ground Terminal (Earth) to two SD2200i
generators (fig. 1).
2. Connect both the RED and BLACK wires to the PARALLEL OPERATION
OUTLETS on both SD2200i generators. Ensure that both wires are in the same
location on both generators (fig. 2).
3. Make sure the Economy throttle switch is in the OFF position on both
generators (fig. 3).
4. All electronic devices should be turned “OFF” and disconnected from inverter
generators prior to starting generator engines.
5. Start generator engines. Make sure the green power indicator LED comes on for
each generator.
6. When engines have stabilized, plug in electronic device to AC socket and turn
on first load.
7. Allow generator output to stabilize (engine and attached devices run evenly)
before plugging in the next load.
Maximum Power in Parallel Operation: 3.96VA
Rated Power in Parallel Operation: 3.6kVA
Limit operation time to 3 seconds for load requiring maximum output. For
continuous operation, do not exceed the rated output.
Note: It is strongly recommended to plug in devices with the largest output first
and the smallest output last to help prevent overloading the generator.
OFF
ON
AC SW.
PARALLEL
OPERATION
OUTLETS
OFF
ON
ECONOMY
OFF
PARALLEL
OPERATION
OUTLETS
OFF
ON
OMY
OFF
ON
AC SW.
PARALLEL
OPERATION
OUTLETS
OFF
ON
ECONOMY
Fig. 1
Fig. 2
Fig. 3
Customer Service Hotline -
1800 069 486 Aus
0508 069 486 NZ
fullboartools.com.au
Ozito Industries Pty Ltd
Australia (Head Office)
ACN 050 731 756
1-23 Letcon Drive, Bangholme
Victoria Australia 3175


Product specificaties

Merk: Full Boar
Categorie: Niet gecategoriseerd
Model: DPC-AU02

Heb je hulp nodig?

Als je hulp nodig hebt met Full Boar DPC-AU02 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Full Boar

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd