Festo VABM-B10-25E-G12-9 Handleiding
Festo
Niet gecategoriseerd
VABM-B10-25E-G12-9
Bekijk gratis de handleiding van Festo VABM-B10-25E-G12-9 (1 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 2 mensen en kreeg gemiddeld 4.9 sterren uit 1.5 reviews. Heb je een vraag over Festo VABM-B10-25E-G12-9 of wil je andere gebruikers van dit product iets vragen? Stel een vraag
Pagina 1/1

Assembly instructions (Original instructions)
8069056
1702b
[8069058]
†‡
Connection block
VABM-B10-25E
Festo SE & Co. KG
Ruiter Straße 82
73734 Esslingen
Germany
+49 711 347-0
www.festo.com
1. Applicable documents
All available documents on the product www.
festo.com/pk
2. Safety
Switch off compressed air before mounting work.
Observe tigh
tening torques.
3. Intended use
Pneuma
tic linking of the valves.
4. Further inf
o
rmation
Accessories for VABM www.fes
to.com/catalogue
5. Scope of delivery
20518d_1
VABM-B10-25E-...
1 Connection block
2 Screw M4x50
1)2)
3 Seal
1)2)
4 Seal
1)
5 Blanking plug B-1/2
6 Blanking plug B-1/8
(1x)
(nx)
(nx)
(nx)
(3x)
(2x)
20518d_2
VABM-B10-25E-...-P3
1 Connection block
2 Screw M4x50
1)2)
3 Seal
1)
4 Seal
1)
5 Blanking plug B-1/2
6 Blanking plug B-1/8
(1x)
(nx)
(nx)
(nx)
(2x)
(1x)
6. Not in scope of d
e
livery
20520d_3
7 Solenoid valve
VUVS-... or
pneumatic valve
VUWS-...
1)
8 Screw set
1)
VAME-B10-25-S
only for VUVS-LK…-S,
with screws
ISO 4762-M4x40-8.8
(nx)
(nx)
20518d_13
1)
The number of screws , seals 2 8/3 4/ and valves 7 is dependent on the available
valve positions.
2)
Number = 2 x available valve positions
7. Mounting of blanking plugs 5
5
5
55/6
6
6
66
20518d_5
Screw in the blanking
plugs 5 6/ at the desired
position, as required.
Blanking plug [Nm]
58.5 _ 15 %
6 5.0 – 20 %
8. Mounting of connection block 1
1
1
11
20518d_6
Place connection block 1
on mounting surface (A).
Tighten screws (B).
9. Alignment of seal 4
4
4
44
20518d_11
For valves VUVS-L/LT...:
Place the seal 4 in the
depression of the valve 7
so it is positive-locking.
Observe channel
designation 1/3/5 or 1/3.
20
51
8d_12
For valves VUVS-LK...-S:
Place seal 4 on the
valve 7. Observe channel
designation 1/3/5 or 1/3.
Indexing hole (X) on the
valve 7 is:
– Only relevant for connection
block VABM-B10-25E-...
– Hidden after alignment
of the seal 4.
10. Mounting of valve 7
7
7
77
Information
Screws 8 can only be mounted with solenoid valves 7 VUVS-LK…-S.
Seals 3 can only be mounted for solenoid valves 7 with external pilot air
supply.
20518d_7
/Push screws 2 8 into the
drill holes of the valve 7.
Only screws 2 are loss-
protected.
Insert seals 3 into the
orifices (C). Rotating
movement required during
mounting.
Position valve 7 on the
connection block 1.
Check:
– Projection (D) is in the
slot (E)
– Valve 7 is aligned parallel
to the surface (F)
– Channel designations 1/3/5
or 1/3 agree with each
other.
Tighten screws 2 8/ .
3 Nm _ 20 %
1
1
5
6
2
4
1
5
6
2
4
A
B
7
4
3
C
E
1
F
5
6
7
4
D
315
3
3
2
/
8
7
4
C
315
X
X
X
7
8
Product specificaties
Merk: | Festo |
Categorie: | Niet gecategoriseerd |
Model: | VABM-B10-25E-G12-9 |
Heb je hulp nodig?
Als je hulp nodig hebt met Festo VABM-B10-25E-G12-9 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Niet gecategoriseerd Festo
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
Handleiding Niet gecategoriseerd
- Idec
- Gudsen
- Gardol
- Contemporary Research
- MARTVSEN
- Ernesto
- Shure
- Haws
- Meradiso
- Boyo
- Honeywell
- Sharkbite
- Zennio
- Kingston Technology
- Easymaxx
Nieuwste handleidingen voor Niet gecategoriseerd
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025
15 Juni 2025