Festo VABM-B10-20EEE-G38-2-P3 Handleiding

Festo Niet gecategoriseerd VABM-B10-20EEE-G38-2-P3

Bekijk gratis de handleiding van Festo VABM-B10-20EEE-G38-2-P3 (1 pagina’s), behorend tot de categorie Niet gecategoriseerd. Deze gids werd als nuttig beoordeeld door 2 mensen en kreeg gemiddeld 4.1 sterren uit 1.5 reviews. Heb je een vraag over Festo VABM-B10-20EEE-G38-2-P3 of wil je andere gebruikers van dit product iets vragen? Stel een vraag

Pagina 1/1
Assembly instructions (Original instructions)
8069064
1702b
[8069066]
†‡
Connection block
VABM-B10-20EEE
Festo SE & Co. KG
73734 Esslingen
Germany
+49 711 347-0
www.festo.com
1. Applicable documents
All available documents on the product www.
festo.com/pk
2. Safety
Switch off compressed air before mounting work.
Observe tigh
tening torques.
3. Intended use
Pneuma
tic linking of the valves.
4. Further inf
o
rmation
Accessories for VABM www.fes
to.com/catalogue
5. Scope of delivery
2027
6d
_1
VABM-B10-20EEE-...
1 Connection block
2 Screw M3x40
1)2)
3 Screw M5
4 Seal
1)2)
5 Seal
1)
6 O-ring 17x2
7 O-ring 10x2
(1x)
(nx)
(2x)
(nx)
(nx)
(3x)
(2x)
2027
6d
_2
VABM-B10-20EEE-...-P3
1 Connection block
2 Screw M3x40
1)2)
3 Screw M5
4 Seal
1)
5 Seal
1)
6 O-ring 17x2
7 O-ring 10x2
(1x)
(nx)
(3x)
(nx)
(nx)
(2x)
(1x)
6. Not in scope of d
e
livery
20260d_3
8 Solenoid valve
VUVS-… or
pneumatic valve
VUWS-...
1)
9 Screw set
1)
VABM-B10-20-S
only for VUVS-LK…-S,
with screws
ISO 4762-M3x30-8.8
(nx)
(nx)
2027
2d
_1
3
1)
The number of screws , seals 2 9/4 5/ and valves 8 is dependent on the available
valve positions.
2)
Number = 2 x available valve positions
7. Mounting of O-rings 6
6
6
66/7
7
7
77
20276d_3
Place greased O-rings 6 7/
into the depressions.
8. Mounting of connection b
l
ock 1
1
1
11
20276d_4
Place connection block 1
on mounting surface (A).
Push connection block 1
onto the connection
block (B).
Check: O-rings 6 7/ are
seated in the depressions.
Tighten screws 3.
9. Alignment of seal 5
5
5
55
20272d_8
For valves VUVS-L/LT...:
Place the seal 5 in the
depression of the valve 8
so it is positive-locking.
Observe channel
designation 1/3/5 or 1/3.
2027
2d_12
For valves VUVS-LK...-S:
Place seal 5 on the
valve 8. Observe channel
designation 1/3/5 or 1/3.
Indexing hole (X) on the
valve 8 is:
Only relevant for connection
block VABM-B10-20EEE-...
Hidden after alignment
of the seal 5.
10. Mounting the valve 8
8
8
88
Information
Screws 9 can only be mounted with solenoid valves 8 VUVS-LK…-S.
Seals 4 can only be mounted for solenoid valves 8 with external pilot
air supply.
20276d_5
/Push screws 2 9 into the
drill holes of the valve 8.
Only screws 2 are loss-
protected.
Insert seals 4 into the
orifices (C). Rotating
movement required during
mounting.
Position valve 8 on the
connection block 1.
Check:
Projection (D) is in the
slot (E)
Valve 8 is aligned parallel
to the surface (F)
Channel designations 1/3/5
or 1/3 agree with each
other.
Tighten screws 2 9/ .
1.4 Nm _ 20%
3
1
6
7
2
3
5
1
6
7
2
3
A
B
8
5
4
C
E
4
4
5
7
6
1
4.3 Nm _ 20 %
1
F
8
5
D
315
2
/
9
8
5
D
315
X
X
X
8
9


Product specificaties

Merk: Festo
Categorie: Niet gecategoriseerd
Model: VABM-B10-20EEE-G38-2-P3

Heb je hulp nodig?

Als je hulp nodig hebt met Festo VABM-B10-20EEE-G38-2-P3 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden