Astralpool Cala Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Astralpool Cala (35 pagina's) in de categorie Temperatuurregelaar. Deze handleiding was nuttig voor 19 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/35
STEAM BATH INSTALLATION GUIDE
Fluidra reserves the right to alter the characteristics of its products without prior notice
Steam bath installation guide....................................................................................................................................
Construction of the cabin and pre-construction installations...............................................................................
Custom built cabin
Construction system for the steam bath........................................................................................................................
Advantages of the prefabricated ceiling .......................................................................................................................
Installation of the prefabricated ceiling..........................................................................................................................
Graphic guide for the installation of the prefabricated modules. ..................................................................................
Graphic guide for the installation of the ceiling modules ..............................................................................................
Prefabricated cabin
Advantages of the prefabricated cabin compared to a custom built cabin...................................................................
Material and basic components of the steam cabin.....................................................................................................
Horizontal section of the prefabricated cabin...............................................................................................................
Vertical section of the prefabricated cabin ..................................................................................................................
Construction detail and anchoring of the steam bath...................................................................................................
Available models. Capacity and laout...........................................................................................................................
Assembly and installation process................................................................................................................................
Assembly of the cabin...................................................................................................................................................
Procedure for installing the steam cabin.......................................................................................................................
Control panel
Function keys................................................................................................................................................................
General operation.........................................................................................................................................................
Troubleshooting............ ...............................................................................................................................................
Troubleshooting guide...............................................................................................................................................
Maintenance guide...................................................................................................................................................
Steam bath rules for use
Contradictions...............................................................................................................................................................
Speciîš¿c considerations ................................................................................................................................................
Cleaning and disinfecting the aroma oil system .....................................................................................................
Required power of the generator with regard to cabin size....................................................................................
Sections and protections for electric cables............................................................................................................
Ecotouch electrical diagram......................................................................................................................................
CONTENTS
1
6
7
8
8
9
10
12
12
13
13
14
15
16
16
17
22
22
24
25
28
30
30
31
31
32
33
Fluidra reserves the right to alter the characteristics of its products without prior notice
1. The steam pipe must not have any pronounced bends or elbows.
2. The steam pipe must not have any siphons where condensed water may collect and lead to a blockage.
3. Steam baths that are used for more than one hour continuously must have air vents installed.
4. The steam generator must not be cut off from the electricity supply, therefore timer switches or other similar devices may not be installed.
5. The length of the drainpipe must slope down towards to the downpipe.
6. The ambient temperature outside the steam cabin must not be more than 35 degrees.
7. The temperature probe must be placed as far away as possible from the steam outlet.
8. A water analysis must be carried out before starting up the equipment. If the water hardness is more than 4 French degrees, a water softener must
be installed.
9. Do not install the steam equipment without a ground connection.
Location of the generator:
The following requirements are necessary for the generator’s location:
1. A room that is no smaller than 80 cm wide, 50 cm deep and 170 cm high.
2. The room where it is installed must be dry and well-ventilated.
3. Do not install in machinery rooms where corrosive products such as chlorine are used.
4. The equipment must be installed outside the steam cabin, but as close as possible to it. The steam pipe must not be more than 15 metres long.
5. The equipment must be installed perfectly vertical.
6. The equipment must rest on the ground and be îš¿xed to the wall using 4.5 x 60 mm plastic wall plugs and stainless steel screws. Before îš¿xing the equi-
pment in place, ensure that the drain outlet is higher than the connection designed for it, so that the generator can be emptied correctly.
Connection to power supply: When connecting the electricity supply, îš¿rst connect the ground wire followed by the active wires to the differential switch
inside the steam generator. Connection must be made taking into consideration the type of power supply (page 15). On page 32 the recommended cable
section and associated protection is given, according to the size of the generator. Cables must be copper, RZ1-K (AS) safety and protected by a differen-
tial switch or circuit breaker with an opening that guarantees a minimum separation of contacts of 3 mm. In all cases, the electrician is responsible for the
installation according to the Low Voltage Electrotechnical Regulations.
Once completed turn on the switch to the right, the pilot light will come on, meaning that the generator is connected to the power supply.
If the wires must be disconnected, îš¿rst of all disconnect the active wires and subsequently the ground connection.
The generator must, without fail, be grounded. If it is not connected to earth, electrical accidents may occur. The power supply must not be cut-off or the
side switch turned off before two hours after the steam supply to the cabin has been switched off because the generator drains the system various times
during this period to prevent the accumulation of mineral salts in the boiler. Therefore, timers must not be installed as these may cut off the power supply.
Connection to water supply: The steam generator has a ½ inch shut off valve for the water supply. This can be connected to the cold water supply. The
water pressure must be between 2 and 6 kp/cm2. Before starting up the generator the pipes must be ushed out to prevent metal residues from being intro-
duced into the generator’s boiler tank. Before starting up the generator, an analysis of the water must be carried out to determine its hardness. If it is above
4 French degrees a water softener must be installed.
Connection to drain: The pipes must be installed with a slope towards the downpipe, with no siphons where water can accumulate.
Connection of light îš¿xture: A light îš¿xture with a 24 volt bulb is supplied with the equipment for lighting inside the cabin.
Connection of temperature probe: The sensor must be placed between 150 and 170 cm from the oor and as far as possible from the steam outlet. A
trim cover is supplied with the equipment to cover the sensor. It must be placed vertically so that the air can circulate around it. If there is a gap between
the sensor and the cabin, the cable can be lengthened using a low voltage armoured two core cable.
Connection of steam pipe to the cabin: A 22 mm copper or stainless steel pipe must be used for the steam line. Generators with more than 12 kW of
power have 2 or more steam lines, therefore as many lines as generators must be connected to the steam cabin. Warning: Do not connect two generator
outlets to one line as the pressure and the correct temperature of the generators may be exceeded. The steam lines must not have siphons where con-
densed water could block the steam’s path.
STEAM BATH INSTALLATION GUIDE
1
Fluidra reserves the right to alter the characteristics of its products without prior notice


Product specificaties

Merk: Astralpool
Categorie: Temperatuurregelaar
Model: Cala

Heb je hulp nodig?

Als je hulp nodig hebt met Astralpool Cala stel dan hieronder een vraag en andere gebruikers zullen je antwoorden