Apc WNSC010110 Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Apc WNSC010110 (2 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 26 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/2
Schneider Electric Critical Power and Cooling Services www.apc.com Rev 2/18/10
- 1 - InfraStruxure® Management Software Configuration Suite
1.0 Executive Summary
The InfraStruxure® Management Software Configuration Suite is a collection of software
configuration services designed to support the implementation of the customer’s data center
management software solution. The customer will have the option of selecting varying quantities of
mandatory and optional services to support the data center management application chosen in the
solution. InfraStruxure Management Software Configuration Suite options are listed below:
InfraStruxure Management Software Configuration Base – Mandatory service
InfraStruxure Central Software Configuration – Optional
InfraStruxure Operations Software Configuration – Optional
InfraStruxure Capacity Software Configuration – Optional
InfraStruxure Post Configuration Insight - Optional
Each of the individual service option will have activities unique to the specific application. The
details of the individual activities will be defined in the respective Statements of Work (SOW). The
individual SOW will outline the service objectives associated with the specified activity. In addition
the service objectives for the individual service SOW will include the Features & Benefits, Details of
Service, Assumptions, Deliverables, Exclusions, Scope of Responsibility, Project Work Details,
Pricing and Terms & Conditions.
2.0 Features & Benefits
Features Benefits
A menu selection of software
configuration services
This allows for customization of standard service to meet customer
needs
3.0 Details of Service
The InfraStruxure Management Software Configuration Suite is an aggregation of individual service
option activities. The details of the service activities are outlined in the respective SOW.
4.0 Assumptions
The assumptions associated with the individual service activities are outlined in the respective
SOW.
5.0 Deliverables
The deliverables associated with the individual service activities are outlined in the respective
SOW.
Statement
of Work
I
In
nf
fr
ra
aS
St
tr
ru
ux
xu
ur
re
e®
®
M
Ma
an
na
ag
ge
em
me
en
nt
t
S
So
of
ft
tw
wa
ar
re
e
C
Co
on
nf
fi
ig
gu
ur
ra
at
ti
io
on
n
S
Su
ui
it
te
e
Professional Service
Table of Contents
1.0 Executive
Summary
2.0 Features &
Benefits
3.0 Details of Service
4.0 Assumptions
5.0 Deliverables
6.0 Exclusions
7.0 Scope of
Responsibility
8.0 Project Work
Details
9.0 Pricing
10. Terms &
Conditions
Schneider Electric Critical Power and Cooling Services www.apc.com Rev 2/18/10
- 2 - InfraStruxure
®
Management Software Configuration Suite
6.0 Exclusions
A
ll exclusions will be associated with the individual service activities are outlined in the respective
SOW.
7.0 Scope of Responsibility
The scope of responsibility will be associated with the individual service activities are outlined in the
respective SOW.
8.0 Project Work Details
The information stated here are the details of the project performed by APC for the customer
including the schedule, location and successful completion criteria.
8.1 SCHEDULE
Actual set dates will be discussed and approved between APC and the customer.
8.2 LOCATION
The location of this installation will be on-site and performed at the ship to location of the
equipment unless informed of a new location by the customer in a 48-hour period before
installation is to be done.
8.3 COMPLETION CRITERIA
APC is expected to have finished its written duties when any of the following occurs:
A
PC completes all the tasks described in Section 5.0 of this Statement of Work
This service and SOW are terminated for other reasons, within the APC Customer Agreement.
9.0 Pricing
Pricing for the InfraStruxure Management Software Configuration (WNSC01) will be the sum of the
individual service activities.
10.0 Terms and Conditions
A
PC standard Terms and Conditions apply.
© 2010 Schneider Electric. All rights reserved. All Schneider trademarks are property of Schneider Electric and
its subsidiaries and affiliates. Other trademarks are property of their respective owners. Specifications are
subject to change without notice. Disclaimer: This information is reliable at the point of creation and may be
subject to change.


Product specificaties

Merk: Apc
Categorie: Niet gecategoriseerd
Model: WNSC010110

Heb je hulp nodig?

Als je hulp nodig hebt met Apc WNSC010110 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Apc

Apc

Apc SP3OPT008 Handleiding

26 Februari 2024
Apc

Apc P4V Handleiding

27 November 2023
Apc

Apc ACRC100 Handleiding

31 Augustus 2023
Apc

Apc UTS10BI Handleiding

3 Augustus 2023
Apc

Apc AP7768 Handleiding

3 Augustus 2023
Apc

Apc UTS6H Handleiding

3 Augustus 2023
Apc

Apc PDPM144F Handleiding

3 Augustus 2023

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd