Aiphone TW-TA-ARM-SP Handleiding
Pagina's 7 Niet gecategoriseerd
Bekijk de handleiding van Aiphone TW-TA-ARM-SP gratis online of download de PDF. Deze handleiding is 1 keer bekeken. Vraag over dit model? Stel een vraag

INSTRUCTIONS
TW-TA-ARM-SP & TW-TE-ARM-SP
Installation Guide
The TW-TA-ARM-SP and TW-TE-ARM-SP are tall, lightweight aluminum towers with an included
high power speaker, camera arm with universal NTP pipe threading, and either ASSISTANCE
or EMERGENCY lettering. They are designed to house IX | IXG Series emergency call stations.
A strobe light and panel lighting are also included for visibility. The towers require a TW-MKL
L-bracket mounting kit to secure to the ground, which is sold separately. This guide shows
installation and wiring procedures, as well as programming steps for the emergency station.
Specications and Package Contents
Box 1 Contents
• One volume control module (taped to the inside the tower)
Box 2 Contents
• One speaker and beacon strobe light (pre-assembled)
• 4 5/16-18” x 1-1/4” large button head tamper resistant screws
• One T40 Torx hex bit for 5/16 screws
• One T25 Torx hex bit for access panel screws
• One container of anti-seize lubrication
Box 3 Contents
• One camera arm
• 4 5/16-18” x 1-1/4” large button head tamper resistant screws
• One T40 Torx hex bit for 5/16 screws
TW-MKL Package Contents (sold separately)
• Four L-bolts
• hex nutsEight 3/4"
• Eight 3/4" washers
• One printed installation template
• Assembly Instructions
Access Panel
Specications
MaterialAluminum 6061-T6
Dimensions
172""" H x 8 W x 8 D
Weight99 lbs
Beacon
Strobe Light
Speaker
Assistance or
Emergency
Lettering
Mount for
Emergency
Station
Camera Arm

TW-MKL Installation
Intercom and electrical wire conduits should be run through the foundation and into the center
4" diameter hole of the tower. These cable runs must be run in separate conduits. It is the
responsibility of the installer to ensure that all applicable electrical codes are met.
Pour the foundation at least 2 feet in diameter and 3 feet deep, while staying in accordance with
local building codes and the frost line.
Install the four L-bolts below the grade with 5" projecting above the grade (see drawing below).
Use the provided installation template to properly position the L-bolts within the concrete
foundation.
Once the foundation has set, remove the template. Install one 3/4" hex nut and one washer on each
L-bolt 2 to 2-1/2" above grade to the top of the washer. This will leave a 1/2" air gap between the
foundation and tower base to allow airflow and prevent moisture buildup. Verify that the nuts are
level.
It is recommended to
transfer the provided
installation template to a
piece of wood between
1/2""and 1 thick. This will
make it easier to position
the L-bolts into the poured
concrete foundation.
Concrete
3 Feet
2 Feet
Ground
Conduit(s)

Tower Mounting
Prior to installing the tower onto the mounting bolts, it is recommended to install the camera arm
rst, then the speaker and beacon strobe light.
Thread the camera through the arm prior to installation. Apply the anti-seize lubrication to the
threading of the 5/16 tamper resistant screws," then use them to fasten the camera arm’s base
to the tower. These screws must be tight to ensure a water tight seal.
The beacon strobe and speaker come pre-attached to one another,
and will attach to the camera arm’s base. Feed the wires for the
beacon strobe light and speaker through the hole on the top of the
tower. As before, apply the anti-seize lubrication to the threading
of the 5/16 tamper resistant screws," then use them to fasten the
beacon strobe light and speaker to the tower. The strobe light will
require a dedicated 24V DC power supply or the PS-POE. This will
also be used to power the tower’s LED illuminator, located above
theintercom.
The speaker will require a separate, 120V AC power line run, and the camera will require a
dedicated network drop. Consult the camera’s power and networking requirements prior to
installation.
Once all components are installed, the tower is ready to mount. Remove
the access panels from the tower. Carefully lift the tower onto the level
hex nuts of the L-bolts, ensuring that the tower and emergency station
opening are oriented in the desired direction. Check that the tower is level
at this point. Install the second set of nuts and washers on the L-bolts
and carefully tighten them, securing the tower to the concrete foundation.
Adjust as necessary.
Be sure to apply the
provided anti-seize
lubrication to the screws’
threading before they are
installed. Failure to use the
anti-seize may cause
corrosion and damage to
the tower and screws.
For safety,
always use
two or more
people to lift and
move the tower.
Product specificaties
| Merk: | Aiphone |
| Categorie: | Niet gecategoriseerd |
| Model: | TW-TA-ARM-SP |
Heb je hulp nodig?
Als je hulp nodig hebt met Aiphone TW-TA-ARM-SP stel dan hieronder een vraag en andere gebruikers zullen je antwoorden